The project
This project involves extending Line 12 of the Grand Genève tramway (Palettes-Moillesulaz) from the Moillesulaz border crossing to the town center of Annemasse.
The tramway largely follows the historic road to Geneva.
A total of 3.3 km long, the tramway will integrate 15 new stations over a distance of 2.1 km
This extension links a highly urban and densely populated area (Gaillard, Ambilly and Annemasse).
The cost of this work is €57 million for Phase 1.
The works package awarded to RAMPA TP focuses on rerouting the existing networks before the building of the tramway platform